[Jan-2024 Newly Released] C-TS422-2021 Dumps for SAP Certified Application Associate Certified [Q30-Q46]

Rate this post

[Jan-2024 Newly Released] C-TS422-2021 Dumps for SAP Certified Application Associate Certified

Updated Verified C-TS422-2021 dumps Q&As – 100% Pass

NO.30 Which actions does the system preform by default when you save a confirmation for a finished product in repetitive manufacturing?

 
 
 
 
 

NO.31 Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

 
 
 
 

NO.32 What happens to this dependent requirement when you convert the planned order into a production order?

 
 
 
 

NO.33 Your proyect team decides to use a make-to-order planning strategy for strategic in discrete manufacturing.
What is the impact of this decision?

 
 
 
 

NO.34 Which item statuses can you select inside a material BOM?

 
 
 
 

NO.35 Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider?

 
 
 
 

NO.36 Your project used process orders for the production of liquid chemicals.
What can you define to ensure that the production flow happens only in physically connected tanks?

 
 
 
 

NO.37 In the Schedule Production app which setting can you make for the planning strategy?

 
 
 
 
 

NO.38 You want to set up a make-to-order planing scenario for finished material. The bil of material contains two components: one should be procured for each sales order individually, the other one shold be procured jointly for all independent requirements. Forcasting for the finished product is NOT possible. Which setting do you make to achive this?

 
 
 
 

NO.39 What are the possible results of a production planning run in Advanced Planning (PP/DS)?

 
 
 
 
 

NO.40 You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched. How does the insertion take place?

 
 
 
 

NO.41 Which time elements are relevant for lead time scheduling of a production order?

 
 
 
 

NO.42 Which mhetods are available for goods issue posting of material components for process orders?

 
 
 
 

NO.43 How can you achive a feasible production plan in case of capacity constraints?

 
 
 
 
 

NO.44 How can you carry out cost object controlling for production orders?

 
 
 
 

NO.45 Which of the following questions do you have to answer before you start creating a BOM?

 
 
 
 

NO.46 Where do you maintain data to determine the duration of an operation for production?

 
 
 
 

Latest C-TS422-2021 Exam Dumps SAP Exam from Training: https://www.dumpsreview.com/C-TS422-2021-exam-dumps-review.html

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt www.stes.tyc.edu.tw

Related Posts

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below