C_TS422_1909 Questions Prepare with Learning Information! 2022 Regularly updated [Q47-Q61]

Rate this post

C_TS422_1909 Questions Prepare with Learning Information! 2022 Regularly updated

Get C_TS422_1909 Products Practice Material for C_TS422_1909 Exam Question Preparation

SAP C_TS422_1909 Exam Description:

The “SAP Certified Application Associate – SAP S/4HANA Production Planning and Manufacturing” certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.

SAP C_TS422_1909 Certification Exam Topics:

Topic Areas Topic Details, Courses, Books
Master Data in SAP S/4HANA > 12%

Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version.

Capacity Planning in SAP S/4HANA 8% – 12%

Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics.

Introduction to SAP S/4HANA Supply Chain Planning < 8%

Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy.

Lean Manufacturing in SAP S/4HANA 8% – 12%

Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes.

Advanced Planning in SAP S/4HANA > 12%

Outline the basics and master data of advanced planning,  explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts

Process Orders in SAP S/4HANA < 8%

Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP).

 

Q47. You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?

 
 
 
 

Q48. Which warehouse management functions are available in SAP EWM but NOT in SAP WM?
There are 3 correct answers to this question.
Response:

 
 
 
 
 

Q49. You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?

 
 
 
 

Q50. The procurement type of your material is set to “E” for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA?
Please choose the correct answer.
Response:

 
 
 
 

Q51. What does the bill of material usage (BOM usage) control at the BOM item level?
Response:

 
 
 
 

Q52. In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run? Note:
There are 2 correct answers to this question.

 
 
 
 

Q53. What are drawbacks of the separation of OLTP and OLAP?
There are 4 correct answers to this question.
Response:

 
 
 
 
 

Q54. Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.

 
 
 
 

Q55. A planner updated a production order status from partially confirmed “PCNF” to technically completed “TECO” by mistake.
What impact would this have to other users for this specific production order?
Please choose the correct answer.
Response:

 
 
 
 

Q56. You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: There are 2 correct answers to this question.

 
 
 
 

Q57. Which data model changes have been implemented in Sales and Distribution?
There are 3 correct answers to this question.
Response:

 
 
 
 
 

Q58. What are prerequisites for using batch derivation?
There are 2 correct answers to this question.
Response:

 
 
 
 

Q59. Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.

 
 
 
 

Q60. A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named
“W1904_1000_001”. What does the suffix 001 in the resource name represent?
Please choose the correct answer.
Response:

 
 
 
 

Q61. For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning?
There are 2 correct answers to this question.
Response:

 
 
 
 

C_TS422_1909 Exam Certification Details:

Languages: German, English, French, Chinese
Cut Score: 55%
Sample Questions: SAP C_TS422_1909 Exam Sample Question
Exam: 80 questions
Level: Associate

 

Most Reliable SAP C_TS422_1909 Training Materials: https://www.dumpsreview.com/C_TS422_1909-exam-dumps-review.html

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt fortunetelleroracle.com

Related Posts

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below